| |
Production Manufacturing Associate
|
OSRAM Sylvania
|
Wellsboro |
02.07.2012 |
|
| |
This is a general production posting. There may be many positions available as we increase production or employees... |
|
| |
|
|
| |
| |
Cleveland Shipping and Receiving (Dock Worker)
|
Confidential
|
Cleveland |
02.07.2012 |
|
| |
NOW HIRING: Cleveland Shipping and Receiving (Dock Worker)... |
|
| |
|
|
| |
| |
Electrical Maintenance Technician
|
LeSaffre Yeast Corporation
|
Cedar Rapids |
02.07.2012 |
|
| |
Red Star Yeast Company, LLC., a state of the art yeast manufacturing facility in Cedar Rapids, seeks the following... |
|
| |
|
|
| |
| |
Manufacturing Positions
|
Apache Hose and Belting Co., Inc
|
Cedar Rapids |
02.07.2012 |
|
| |
Manufacturing PositionsLooking to join a 100% employee-owned company where you know you can make a difference in the... |
|
| |
|
|
| |
| |
Safety Manager
|
Universal Engineering
|
Cedar Rapids |
02.07.2012 |
|
| |
Safety ManagerA manufacturing organization in the Cedar Rapids area is seeking to hire a Safety Manager. This... |
|
| |
|
|
| |
| |
Quality Assurance Manager
|
Royal Outdoor Products
|
Milford |
02.07.2012 |
|
| |
Quality Assurance ManagerRoyal Outdoor Products, a division of Georgia Gulf Corporation, a leading North American... |
|
| |
|
|
| |
| |
Utililty Operator
|
OSRAM Sylvania
|
Versailles |
02.06.2012 |
|
| |
JOB DESCRIPTION: 1. Perform the various Grade 1, 2, 3, and 4 Finishing Department hand or machine processing, hand... |
|
| |
|
|
| |
| |
Opr/Maint Packaging Equip. 2nd Shift
|
OSRAM Sylvania
|
Saint Marys |
02.06.2012 |
|
| |
1. Clean up, start up, shut down, change over, adjust, and operate lamp packaging, casing equipment, palletizer,... |
|
| |
|
|
| |
| |
Incan Mech Trainee/Incan Mech/Att Aline 3rd
|
OSRAM Sylvania
|
Saint Marys |
02.06.2012 |
|
| |
JOB DESCRIPTION: 1.Oversee and direct assigned operations to maintain scheduled production within established quality... |
|
| |
|
|
| |
| |
Backfill Opr/Maint Packaging Equip. - Pkg 3rd Shift
|
OSRAM Sylvania
|
Saint Marys |
02.06.2012 |
|
| |
1. Clean up, start up, shut down, change over, adjust, and operate lamp packaging, casing equipment, palletizer,... |
|
| |
|
|
| |